
Top stories
Linxon & Available Power partner on 100MW Texas storage project
Engineering and construction services provider Linxon has signed an exclusivity agreement with Available Power for the development of the 100 MW/200 MWh Greenport Battery Energy Storage System (BESS) project in Austin, Texas.
The project scope includes the design, construction, installation, and testing of all equipment required for the BESS installation, including a 345/34.5kV, 130 MVA step-up power transformer, 345kV AIS equipment, battery enclosures, inverter skid with coupling transformer, inverter control system/EMS, and station auxiliary supply system.
The Greenport project is planned to be completed by Q1 2025.